Suzlon Wind Energy Corp., the North American subsidiary of Suzlon Energy Limited (SEL), announced the early completion of the Silver Sage Windpower Project, a Duke Energy wind farm in Cheyenne, Wyoming, that is comprised of 20 Suzlon S88-2.1 megawatt wind turbines.
The Silver Sage Wind Farm began operating in early October. At full capacity, the 20 Suzlon wind turbines are capable of producing 42 MW of wind-generated electricity, which is enough energy to power nearly 20,000 average US homes.* Cheyenne Light Fuel & Power, a utility subsidiary of Black Hills Corp., and Colorado-based Platte River Power Authority are buying the renewable energy generated by Duke Energy at its Silver Sage Project.
In addition to supplying and building the turbines, Suzlon is providing operations and maintenance at Silver Sage through a five-year service agreement with Duke Energy. Suzlon also supplied the 14 S88 turbines in use at Duke Energy’s nearby Happy Jack Windpower Project, a 29-MW wind farm that entered commercial operation in September 2008.
Suzlon has more than 1,600 megawatts of wind turbine capacity installed in the U.S. and a total of 130 megawatts through three projects with Duke Energy.
1 comment:
Il semble que vous soyez un expert dans ce domaine, vos remarques sont tres interessantes, merci.
- Daniel
Post a Comment